Second evening of the build got off to a flying start assembling the right upright and brake hoses. After the trials of the previous nights bolts which were awkward to get to fitting the uprights was a joy of simplicity.
Quickly moved onto assembling the left hand side front suspension. This was a lot easier as I knew exactly what bits were needed where and was a breeze to fit.